In general, the spring and autumn seasons are the most suitable for decoration. Winter is too cold and summer is too hot. Especially in winter, when the weather is too dry, not only does the worker feel tired, but the effect of the equipment is also greatly reduced. Many people think that cracks appear on the brushed wall, or the furniture that was built is actually missing paint.
Winter homes in the North have advantages that are unmatched in other seasons.
Wood products made during the winter can stay in shape for a long time
In the winter, the degree of dryness of the wood is the best, and the moisture content is much lower than in other seasons. The finished products made of such wood are not easy to crack and deform. In addition, the indoor heating is sufficient. Before the paint is applied, the potential problems of the wood are quickly exposed. Timely repairs, so that painted wood or furniture can remain in its original shape for a long period of time.
The second winter does not affect the paint sprayer
According to experts, when the temperature is below -5 degrees, the paint cannot be painted, and in the winter in the north, every family has heating, and the indoor temperature is appropriate. There is no need to worry about the quality of the paint.
Due to the large wind and sand in winter, dust and paint are easily attached when the paint and paint are dry. Care should be taken to select a windless weather for painting so as not to affect the texture of the surface.
Aiheng Decoration Fire Phoenix Decoration
Third, understand the tricks of winter construction
1. Carpenter work to leave seams
Leave an appropriate construction gap. When paving solid wood flooring, about 2 mm of expansion joints should be left around, otherwise it will cause druming and dangling. When making furniture, the door seam should not be too small. In order to avoid the expansion of the summer tight, shut tight, install wooden floors, should also be appropriate to leave gaps larger.
Need to leave about 0.1 mm seams to avoid deformation.
Material: Try to avoid rainy days
2, putty can not be too thick
Because the indoor air is dry, the water loss is faster, and the putty before the oil can't be scraped too thick, otherwise it may cause hollowing, cracking, and wall inequality.
3 The ambient temperature of the coating application should not be lower than 5°C. The ambient temperature of the commonly used mixed-color coating should be above 0°C, and the ambient temperature when the varnish is applied should not be lower than 8°C. Therefore, during the winter decoration, attention should be paid to closing the doors and windows to ensure that the indoor temperature is at least 5°C. In particular, oil workers must pay attention to “warmth†and fully dry the doors and windows after opening. Warm indoor decoration to be moderate, not more than 20 °C is appropriate.
4, after the warm tiles can be paved
No matter whether it is a wall tile or a floor tile, it must be transferred from the outdoor to the interior for 24 hours. Only when it is adapted to the indoor temperature can it be paved, so as to avoid emptying or falling off after construction. In addition, the bricks should be plastered in time after laying.
4, timely ventilation to pay attention to fire, garbage should be cleaned at any time, wood chips, pieces of wood and other flammable materials at any time to clean up, paint and other items should be placed in a balcony and other ventilation places.
5, do not change the heating during the winter
In the home renovation, the general heating system is prohibited from demolition. Especially after entering the heating season, the heating water has been pressurized. If the construction is slightly improper, it is very easy to cause a “running water†accident and cause irreparable damage. Therefore, according to the regulations of the relevant departments, heating pipes and radiators must not be demolished.
6, after the completion of the renovation, the owners can put a pot of clear water in each room. Because of the increase in indoor humidity, it can prevent cracks on walls, top surfaces, furniture, etc. from drying too quickly.
four. Before entering home, the owner must be careful
After the delivery, the owner should not rush to live. Experts suggest that one month or so can be carried in with good ventilation in the room. Since the ventilation during construction in winter is not as good as in other seasons, the interior will more or less leave some harmful gases. In addition, the newly purchased furniture should also be parked in the room for a period of time, allowing the decoration materials and new furniture to completely change their air, so as to meet the arrival of the owner.
Five, winter decoration often encountered three major problems
Problem I: cracking of veneer
Solution: After the decorative panel is transported to the construction site, apply a dry towel to wipe off the floating dust, and apply the brush over the varnish twice. All the decorative panels should be laid flat, with a large core board on the bottom and a large core board on the top, which cannot stand upright. This will prevent the panel from cracking and warping.
Problem two: wall cracking
Solution: Always open the window for ventilation. The best time is between 10am and 4pm. The relatively high temperature during this period of time can prevent the newly approved putty from freezing. After the putty was completely dry the first time, it was approved a second time. After the second putty is completely dry, sand it carefully. Sand gray walls and heat preservation walls are best filled with beanbag cloth or indeed good cloth. They are used to scrape putty directly on beanbag cloth or indeed cloth, and then dry it with sandpaper.
Walls have large holes or depressions. It is best to use gypsum powder and latex to reconcile and flatten the wall to facilitate quick drying and solidification. When there is a large crack in the wall, the local place will be replenished with putty kraft paper. When the area is larger, it is best to paste beanbag cloth and then putty.
Problem 3: Gypsum board ceiling cracks, plaster line cracking
Solution: During the plasterboard ceiling work, gaps of about 1 to 2 cm are left between the plasterboards and between the gypsum board and the wall. The joints are first filled with caulking and then double-clad kraft paper. Putty.
The moisture content of the wooden keel must be controlled below 12%, and the "keel" must be firm and it cannot be loosened, so that cracks in the gypsum board ceiling can be prevented. When the plaster line is plastered, leave gaps of about 0.5 cm between the gypsum board and the top surface and the wall surface. Use gypsum powder and latex to reconcile the gaps to prevent the plaster line from cracking.
Winter decoration is good, there are inconveniences, but it can be made up.
Links: Long-lasting floors like maintenance tips for new floors
Experience in interior decoration paint heating furniture paint floor tile
Valve protective cover has excellent chemical stability, corrosion resistance, sealing, high lubrication non-stick, electrical insulation and good anti-aging endurance. Widely used in papermaking, cement, chemical processing, oil refinery. Can be used for concentrated sulfuric acid, nitric acid, hydrochloric acid, alkali and other acid and alkali pipe flange protection valve protection, easy installation, long service life.
Valve Shields can be made according to the use of different materials, the valve jacket (PVC Spray Shields, PTFE Spray Shields, PP Spray Shields)
Valve Shields
Valve Shields,Valve Spray Shields,Valve Protectors,Safety Shields For Valves
Zhejiang Amin Environmental Protection Technology Co., Ltd. , http://www.safetysprayshields.com